Skip to main content

Running, pausing and stopping a job

The ways to start a run now, what the live view shows, what Pause and Stop do, and changing limits while a backup runs.

Updated
On this page

A job runs on its schedule without you. When you want it now, there are several ways to start it, and one live view that shows what it is doing.

Starting a run#

FromHow
HomeRun on the job's row, or Run all above the table
JobsRun on the row, or ⋯ ▸ Run as full for one full backup
A job's pageRun now
The notification-area iconright-click ▸ Back up now ▸ the job
Ctrl+Ktype the job's name, then choose Run …
A desktop shortcutsee A desktop shortcut that runs a job

The report records who started it: you, schedule, Ask Genie, a desktop shortcut or command line.

One at a time#

GBM AI runs one backup at a time. Start a second and it shows Queued, then starts when the first finishes; Cancel takes it out of the queue. A scheduled run that falls due while another job runs queues the same way.

The live view#

While a backup runs, Home's status area becomes the live panel: the phase and type, the current file, time left, how much is written, Pause, Stop and Details.

Home - live panel of a running backupHome - live panel of a running backup

Details opens the run page:

  • the phase: Taking a snapshot, Scanning, Backing up, Verifying, Applying retention, Finishing;
  • the percentage, the current file, speed, bytes written of the total, and files done of the total;
  • six counters: New, Updated, Unchanged, Deleted, Skipped, Errors;
  • the Live log, with Important and Everything;
  • This run: job, type, destination, compression, encryption, open files and verify;
  • the Performance card (below).

Run page - a backup in progressRun page - a backup in progress

During Verifying the line under the bar reads Verified 1,200 of 2,943 files: every stored file is read back and checked against the manifest.

You can close the window. The background agent finishes the run, and the notification-area icon's two blocks take turns while it works.

Pause#

Pause holds the run where it is. The pill turns amber and the button becomes Resume. Nothing is lost; the set is finished when you resume. Pause this backup is also in the icon's menu, and Pause all is in Ctrl+K. A restore cannot be paused, only stopped.

Stop#

Stop asks first: Stop this backup? A backup set is kept only when it is complete, so the files copied so far are discarded. The next run starts from the last complete backup.

Stopped whileResult
backing upthe run is Stopped; nothing from it is kept (E-RUN-005)
verifying or applying retentionthe set was already complete and is kept (E-RUN-006)

Earlier backups are never touched. The job shows as needing attention until its next complete run. If you only need the disk or the network back for a while, Pause instead.

A restore can be stopped too. It asks Stop this restore?: The files already restored stay where they are. Start the restore again later to bring back the rest.

When the destination goes away mid-run#

A USB cable knocked out, a NAS restarting: the run does not fail at once. Home says Waiting for Backup (H:) to be plugged in or Waiting for \\nas\backups to answer, and the run carries on by itself when the destination is back. After 15 minutes it gives up with E-DEST-001. See Destination not connected, or not answering.

Changing limits during a run#

The run page's Performance card changes this run only, at once, and writes each change to the run log. The job keeps its own settings.

SettingNotes
CPU limit (Pro)below 100 % the backup pauses between files to leave that share of the time free
I/O priority (Pro)Low lets other programs use the disk first; High puts the backup ahead of them
Bandwidth limit (Pro)network and cloud destinations only; a local drive is never slowed
When a backup finishesDo nothing, Sleep, Hibernate or Shut down, for this run

If the PC shuts down mid-run#

The run is marked Interrupted. Nothing from it is kept: the next time the agent starts, it removes the unfinished set from a drive or share. Run the job again, or let the next scheduled run do it; it starts from the last complete backup. A backup does not carry on from where it stopped.

Was this article helpful?